Replace bearings for on chilled water at 285-11F. The presumed asbestos containing material (PACM) gasket material at the flanges will be removed.…
Excavate to correct the domestic water supply line leak at MOX Concrete Batch Plant.…
Replace the tile flooring in the 701-1K Vestibule.…
Determine Solubility and Vapor Pressure of Monomethyl Mercury in Tank Waste Simulants Using Milestone Direct Mercury Analyzer (DMA-80).…
NDE Inspection of the DBCF underground piping. The piping is approximately 7 ft below grade.…
Subcontractor will provide assembly and disassembly roof repairs at Building 105-L. The subcontractor "will not" disturb the existing roof while p…
The planned work scope is for the removal of floor tile and mastic known to contain asbestos in Room 54 of Building 713-N. Dispose of asbestos con…
Award Number: DE-EE0008688 CX(s) Applied: A9, B3.6, B5.1, Building Technologies Office Location(s): FL Office(s): Golden Field Office
Award Number: DE-EE0007494 CX(s) Applied: A9, B5.1, B5.23 State Energy Program Location(s): WI Office(s): Golden Field Office
Project Management & Construction Services (PMCS) will be installing a new electric plant air compressor near Building 725-2N.…