This project will develop and validate with field data an improved software tool for plant engineers to predict ash deposition and heat transfer in…
Develop and test a treatment process that utilizes produced water and waste heat to create chemical and energy synergisms in cooling tower blowdown…
Design, manufacture & install on an electrical grid a 60 MVA flexible large power transformer (LPT). Also, R&D to improve protective relays and dis…
Valve FE-2301 (H-264002-EXTR-HV-138) will be replaced with a like-for-like valve; however, the new valve will have an additional functionality of a ma
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 0/9, 11/2, 12/8, 19/5, and 23/7 on i…
The purpose of this revision is to capture additional project scope. The repaving project required a temporary turn-around location to accommodate …
BPA is proposing to fund Polk Soil and Water Conservation District (PSWCD) to purchase the Smithfield Oaks property, which is a 179-acre parcel of …
Utilize high-performance computational tools to accelerate computational fluid dynamics (CFD) calculations to analyze particle impingement within a…
Improve work conditions inside 511-S for outage and project construction activities supporting the Salt Waste Processing Facility tie-ins by instal…
Paint the wall as you turn right off the elevator on the 2nd floor from corner to corner. The paint should match the color that is currently on the…