This activity will study and develop the process conditions and equipment to calcine up to 1 liter batches of DGA resin in support of the Mk-18A pr…
Crush and run will be applied to level the access path to Sampling Point PB-3 off of Highway 125.…
Remove existing carpet, tile and mastic, abating asbestos and installing new carpet flooring within designated areas of Section A, Building 773-A.…
Measurement of hydrogen generation from SRS Tank Farm actual-waste samples at a series of temperatures with and without addition of glycolate.…
Subcontractor will provide roof repairs at 617-11G. The Subcontractor will disturb the existing roof while performing these repairs on 617-11G. The…
Western Area Power Administration (WAPA) plans to conduct remedial investigations at the Phoenix Area Office to identify chemicals of concern, such…
Idaho National Laboratory (INL) lacks enough office space at the Research and Education Campus (REC) in Idaho Falls to accommodate a growing work f…
There are five projects proposed as Supplemental Environmental Projects to settle the penalty for failing to initiate treatment of sodium bearing w…
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, g…
The Kesselring Site MARF Cooling Tower (Building 79) and Ancillary Facilities (Buildings 79A and 24A) Demolition Project will remove the structures…