The subcontractor shall provide all labor, equipment, transportation and supervision to supply unleaded gasoline dyed off-road diesel and clear hig…
Replace bearings for on chilled water pump at 235-2F. The presumed asbestos containing material (PACM) gasket material at the flanges will be remov…
Excavate to obtain a soil sample from underneath the catch bucket at 715-2G Fueling Station, so the analytical results can be made available to Sou…
Remove one Presumed Asbestos Containing Material (PACM) gasket from ABRP well AHT-14. Removal of gasket will allow for maintenance to repair broke…
The Advanced Reactive System Screening Tool (ARSST), manufactured by Fauske
Replace the Bartex level instrumentaiton for HB-Line Tank NT-31 with radar level instrumentation. Revision is being submitted to provide new dates…
Replace or repair targeted exterior doors for several buildings at the NETL Morgantown site that are currently in poor condition. …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace two 34.5 kV oil circuit breakers (OCB) and associated eq…
Award Number: DE-EE0008692, CX(s) Applied: A9, B5.1, Building Technologies Office, Location(s): NJ, Office(s): Golden Field Office
SRNL is working to develop technology to perform imaging of processes conducted at the Savannah River Site. In this task we will perform imaging o…