The Bonneville Power Administration proposes to construct interconnection facilities (a tap) on the existing Franklin-Badger Canyon No.1, 115-kilov…
Bonneville Power Administration proposes to allow a private landowner/developer to provide Bonneville Power Administration new access easements and…
At Alcoa's expense, the Bonneville Power Administration proposes to replace fourteen conductor hardware assemblies for seven low voltage feeders (2…
Where reasonable and economically feasible, replace High Intensity Discharge fixtures with light emitting diode equivalents. …
The proposed action will replace a failed culvert that crosses the Argonne National Laboratory fence line, east of Kearney Road. The 30" diameter c…
Replace the failed Automatic Transfer Switch (ATS-03) in Building 105-L. The model is not longer manufactured. Some disassembly and removal of elec…
Excavate and repair underground domestic water leak near Building 292-S.…
Abrasive blasting steel structures for coating applications performed by construction forces in the 725-2N Blast Building/Yard. …
Award Number: DE-EE0006990CX Applied: B5.1Weatherization and Intergov’tal Programs OfficeLocation: MSOffice(s): Golden Field Office
This environmental evaluation checklist covers analytical methods to be performed in 773-A Labs B-003, B-046, B-105, B-107, B-138, B-145, B-154 and…