Deactivation and decommissioning of 607-1F Sewage Treatment Plant. It is no longer an active facility. All utilities have been isolated. It has b…
Soil borings will be advanced along the MIPSL, adjacent to sampling locations from the 2005 characterization program. The purpose of this program i…
Two (CMP010A and CMP055A) or more additional groundwater monitoring wells to be installed within the Gordon Aquifer (GAU). Well CMP010A will be app…
This proposed activity entails having a roofing contractor perform concrete core drilling on the roof of H Canyon.…
Synthesis of semiconductor perovskites (CH3NH3)PbI(3-x)(BF4)x and (CH3NH3)SnI(3-x)(BF4)x for the detection and imaging of nuclear materials.…
Secondary Road Maintenance activity. Replace failed 36" corrugated galvanized metal pipe with new 60" HP pipe. This activity will occur in Tims B…
The Western Area Power Administration (WAPA) is proposing to dispose of out-of-service equipment at various WAPA facilities throughout Arizona. The…
This project develops and tests the mechanical properties of replacing 50% of carbon fiber with bamboo in a product to improve certain mechanical p…
This activity includes leachability testing of radioactive spiked monoliths as well as sorption and desorption of possible radionuclide spiked soli…
Award Number: DE-EE0008626, CX(s) Applied: A9, B3.6, Water Power Technologies Office, Location(s): CO, Office(s): Golden Field Office