The scope of this task will replace the diesel engine and generator and consolidate and or replace the existing 4 Motor Control Centers (MCCs) in R…
Setup and testing of sorbent material for incorporation into the offgas mitigation train of the Mobile Melter Consolidation (MMC) effort.…
This activity will encompass two (2) analytical methods that will be performed in 773-A, B-111: Interfacial Tension (IFT) and Oil and Grease Analys…
The purpose of this activity is to perform gate checks and clear weeds and other debris from the conduits at Par Pond Dam and Steel Creek Dam (L-La…
Award Number: DE-AC36-08GO28308, CX(s) Applied: A9, B3.2, NREL, Location(s): CO, Office(s): Golden Field Office
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace existing Structures 15/1, 15/5, 15/6, and 16/4, on its Lo…
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to remove buried oil piping, replace breakers, and replace potential…
The Mission Support Contractor (MSC) and its subcontractors perform modifications within or contiguous to an existing structure, in a previously di…
The Mission Support Contractor (MSC) and its subcontractors perform small-scale activities undertaken to protect cultural resources (such as fencin…