Award Number: DE-EE0008480CX(s) Applied: A9, B3.6Bioenergy Technologies OfficeLocation(s): WIOffice(s): Golden Field Office
The purpose of the proposed action is to address modeling and networking needs to support mission critical work at the Specific Manufacturing Capab…
The chilled water supply to the breathing air compressor (No. 2) after-cooler/moisture separator has a developed a leak in the ceiling adjacent to …
Replace positive crankcase ventilation 001 outlet isolation valves A1-901-SW-V-428 & A1-901-SW-V-429 at 901-A. Valves are leaking. Gaskets will be…
Remove suspect asbestos gaskets on discharge line at 905-103F.…
This work supports HB area by including, dissolution, separation/purification of Pu/Np solutions which may contain Pu, U, Fe, etc., via ion exchang…
Americium will be electrodeposited onto a solid substrate from an acidic media. …
The scope of work would involve the demolition of office Buildings 12-101, 12-102, and 12-107. The scope of work also involves the restoration of t…
A Non-Time Critical Removal Action will consist of an emulsified oil permeable barrier. Trees and vegetation will be cleared and lay-down areas cre…
Replace existing sidewalk on the north side of Buildings 7-11.…