Install compressed gas cylinder bottle rack outside of K-Disassembly Basin, 105-K…
Work will include replacing some ceiling tiles, fixing holes in walls, painting walls and doors, and fixing/repairing the cove base. No asbestos c…
SUD to paint various equipment sitewide. Scopes include cleaning, prepping and painting. …
Award Number: DE-EE0008639, CX(s) Applied: A9, B3.6, B5.15, Bioenergy Technologies Office, Location(s): CA, Office(s): Golden Field Office
This Laboratory Directed Research & Development (LDRD) is designed to evaluate the viability of a self-propagating synthesis method to stabilize an…
Fourier Transform Infrared (FTIR) uses a beam of infrared light to analyze a sample in a non-destructive manner. The samples are returned to custo…
This activity is ongoing and involves the operation and maintenance of an Ion Chromatography (IC) system(s) in 773-A B-134 containment units CHEX h…
Contractor to provide all necessary management and administrative oversight, screening, training, labor, and supplies to provide physical security …
BPA proposes to replace 16 structures and improve access roads on the Fairview-Bandon No. 1, Reedsport-Fairview No. 1, Tahkenitch-Reedsport No. 1, …
SST will obtain perrnits, design and construct an annex to the Training and Cascade Oflice Iluilding (C-104) including site utilities, and associat…