On behalf of United States Geological Survey (USGS), Bonneville Power Administration (BPA) would install a copper fiber cable below an existing ice…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace Structures 2/3 and 2/8 on its Kortes-Miracle Mile (K-MM)…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Estes-Pole Hill …
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to conduct routine vegetation management along its Estes-Pole Hill (…
Inspection and Treatment of utility/power poles in the H Area (Canyon, HTF, General, ETF) and S/Z/J areas.…
Building 704-20N is a double-wide trailer that was used as an administrative office for radiological control operations personnel. The building's …
A subcontractor will design and construct a permeable reactive barrier (PRB) in the subsurface to intersect volatile organic compound (VOC) contami…
Correct/recoat phosphate chemical dike at 782-3A.…
Project Pele is a mobile microreactor program using a two-phased approach to mitigate project and technical risk. Phase I is design and Phase II is…
USG#105 has requested the use of the INL desert site and surrounding areas to conduct research and RF testing on various UHF/VHF transceivers to be…