Transition the existing Siemens PLC and touchscreen to an Emerson DeltaV controller and touchscreen operator workstation in cabinet H-234000-METL-C…
The K-Area Interim Surveillance (KIS) FM-200 fire suppression system will need to be redesigned to replace the soon to be discontinued Chemetron Fi…
This activity involves installing a MicroBlower™ at existing well MRS-34. Furthermore, three existing vadose zone wells (i.e., MVE-13, MVE-17, and…
Correct leak and replace valve SW-V-001(10") at 681-3G Pump House #3.…
The Recipient will develop methods to fabricate and test ceramic anchors with an embedded sensor technology for monitoring the health and processin…
Bonneville Power Administration (Bonneville) is currently proposing to enter into an EIM implementation agreement with CAISO which would obligate B…
Build and optimize an electrical plume collection system and test it in a high-fidelity lab testing and in actual field conditions on an industrial…
Program management, development of high temperature sensor materials, and additive manufacturing. …
Project Management; bench-scale testing activities; techno-economic studies; marketing analysis; data analysis; coal sample shipping; design/machin…