Modify Module Stripper GB3000 in Room 120 of Bldg 264-H to provide removable panels in the glovebox shell to enhance maintenance of the blowers wit…
The Purge Water Disposal Station (PWDS) discharge piping has become clogged with suspected well development fluids suspected of containing portland…
Repair Entry Door #206 and 207 at 292-2F Fan Room.…
Award Number: DE-EE0008650, CX(s) Applied: A9, B5.1, State Energy Program, Location(s): LA, Office(s): Golden Field Office
Award Number: DE-EE0008813, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): DE, Office(s): Golden Field Office
Award Number: DE-EE0008814, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): MI, Office(s): Golden Field Office
This EEC addresses the siting and installation of utilities (under ground electrical supply) of the new Storm Shelter 704-39G located at Burma Road…
This proposed activity entails having a roofing contractor perform concrete core drilling on the roof of H Canyon.…
Replace Valve F1-905102-WW-V-016 at 905-102F Process Deepwell.…
Replace 218-2H Cooling Water Chemical Injection System. The existing chemical addition system for the 218-2H Cooling Water System is not providing…