Ten soil vapor extraction wells (SVE) wells will be disconnected from the Western Sector Treatment System (WSTS) active SVE system and reconfigured…
On Saturday, May 4, 2019, the fire water line west of 221-H South Dock failed. A sink hole was created by the water flow which caused a bollard to…
The DE vessel installed in Room 17 Diffuser System had two of four heater elements fail. In efforts to continue production, the remaining two heate…
Install a domed bubble mirror in Building 772-F men's change room ceiling to cover blind spot in the walkway near the south entrance. …
The Bonneville Power Administration (BPA) is proposing to perform urgent work on the Sammamish-Maple Valley #1 230kV transmission line between stru…
Bonneville Power Administration (BPA) is proposing to allow Tualatin Soil and Water Conservation District (Tualatin SWCD) to survey for and treat –…
Remove two presumed asbestos containing material (PACM) gaskets from Totalizer at Recovery Well 2 to allow for routine maintenance.…
Remove presumed asbestos containing material (PACM) gaskets from flanges and conduct maintenance on #2 Service Water Pump.…
Kairos Power, LLC, in collaboration with Brigham Young University (BYU), proposes to develop and document the methodological approach for establish…
Award Number: DE-EE0008747, CX(s) Applied: A9, B3.6, B3.15, Solar Energy Technologies Office, Location(s): WA, Office(s): Golden Field Office