This design change (M-DCF-K-00585) will replace the 216-B sump pump and the associated discharge piping. Due to the existing anchor bolts in the su…
Five office trailers and one bathroom trailer in L-area will be removed and replaced.…
Award Number: DE-EE0008689 CX(s) Applied: A9, B3.6, B5.1 Building Technologies Office Location(s): NE Office(s): Golden Field Office
Award Number: DE-EE0008749 CX(s) Applied: A9, B3.6, B3.15 Solar Energy Technologies Office Location(s): NC Office(s): Golden Field Office
Removal of presumed asbestos containing material (PACM) gasket material at 784-7A Steam Plant in various flanged connections to allow for maintenan…
Award Number: DE-IE0000098CX(s) Applied: A9Office of Indian EnergyLocation(s): AKOffice(s): Golden Field Office
Award Number: DE-EE0008677 CX(s) Applied: A9, B3.6 Building Technologies Office Location(s): AL Office(s): Golden Field Office
The proposed action upgrades power to meet for experiment usage at the Energy Systems Laboratory (ESL). The proposal adds 1.5 megawatts of electric…
Americium will be electrodeposited onto a solid substrate from an acidic media. Rev. 1 changes lab that work will be performed in.…
This activity details the general operation of the FormLabs Form2 SLA resin 3D printer along with the post-processing tasks associated with 3D prin…