BPA proposes to replace deteriorating and failing concrete foundations and install additional footings at Sycan Compensation Station No. 1 to ensur…
BPA proposes to fund the Washington Department of Fish and Wildlife and the U.S. Geological Survey to conduct long-term monitoring activities for t…
Bonneville Power Administration (BPA) proposes to decommission communication components at multiple substations and radio facilities in its #KC reg…
Preparation work on TRU Pad 4 for installation of Non-Destructive Assay (NDA), Non-Destructive Evaluation (NDE), and Flammable Gas Analysis (FGA) e…
The Proposed Activity (PA) is to install temporary modification, 233H-TMC-19-280 via associated WOs 1745994 and 1752113, which would disconnect the…
Install new ATM Saphir 550 polisher/grinder assemblies and laboratory sink in 234-7H and D&R existing Buehler polisher/grinder assemblies. Replace…
Overhaul pump EFP #1 at 902-5B.…
Remove receptacles and non-load bearing wall between Rooms10 &11 in Building 773-63A.…
Currently, the Pantex Plant has a large volume of surplus container inventories. The proposed action would consist of leasing an off-site storage …
The activities covered in this CX are for using active electro seismic (ASE) in place of PES. CXs for UND EERC locations in Grand Forks, ND and Gre…