Fabricate and process various agarose-based diffusive gradients in thin films (DGT) samplers.…
Replace Carpet on Second Floor in Building 730-2B.…
CX-020237: Install NALCO 3D Traser Cooling Tower Water Chemistry Control System at the 3H Evaporator
Install NALCO 3D Traser Cooling Tower Water Chemistry Control System at the 3H Evaporator.…
In support of activities at PBF-622, the proposed action leases and installs two 12' x 56' office trailers on the asphalt on the north side of PBF-…
The project is used for laboratory scale combustion and sensors research. It is set up for safe handling of cylinder gases, including fuel gases, o…
Funding will support the project team's information gathering and analysis efforts to construct an intelligent, real-time emergency control system …
Replace Carpet in Room 1059 of Building 766-H.…
Replace Cove Base and Paint Room 125 in Building 707-7F.…
Correct and replace faulty electrical wiring between G2-681-3-ELNH-BKR-P1-2D and G2-681-3-ELNH-DISC-001 in 681-3G Pump House.…
Remove old doors and replace entry doors on Trailers 704-22G,704-23G and 704-25G.…