Award Number: DE-EE0008844, CX(s) Applied: A9, B3.6, B3.15, Fuel Cell Technologies Office, Location(s): OR, Office(s): Golden Field Office
Replacement of AHU-B and AHU-C at 292-F. This will include disposal of old Air Handling Units.…
Award Number: DE-AC36-08GO28308, CX(s) Applied: B3.11, NREL, Location(s): CO, Office(s): Golden Field Office
This proposed activity includes the installation of a new SAS storage bed and replacing the existing Carbon Steel Nitrogen Exhaust Line for the SAS…
Award Number: DE-EE0007827, CX(s) Applied: A9, B3.16, Water Power Technologies Office, Location(s): WA, Office(s): Golden Field Office
Develop novel membrane technology based on Zwitterionic copolymers that can provide cost-effective pretreatment for produced water.…
The primary objectives of the research are to address key challenges of CCUS projects, facilitate data collection, sharing and analysis, assess tra…
Bonneville Power Administration (BPA) proposes to allow Weyerhaeuser to improve 1.1 miles of an existing access road in BPA’s fee-owned right-of-wa…
BPA is proposing to conduct inspection & repair of transmission tower steel lattice legs and concrete footings at transmission structures of the Ch…
Subcontractor will provide roof repairs to Building 717-2B. The Subcontractor will not disturb the existing roof while performing these repairs on …