Paint Rooms 326 and 332 in Building 730-2B. Remove and replace carpet in Room 326.…
Subcontractor will provide roof replacement at Building 737-A. The Subcontractor will disturb the existing roof while performing this replacement o…
This EEC covers analytical methods for Radiochemical Measurements.…
Install sidewalk at Trailer 704-10F.…
Fabricate and install new sign on existing frame at Building 719-5N. Scrape and paint sign frame.…
Clean & paint Heat Exchanger covers at K-Area (Far Side) Handball Court.…
Install outdoor shade sails in B-Area.…
Western Area Power Administration (WAPA) proposes to replace existing Structures 28/8, 28/9, and 29/2 along its Kersey West - Willoby (KRW-WBY) 115…
Design, fabricate and laboratory test a SiC based 100 kVA module that can (later) be used as a basis for constructing a modular low-cost SiC-based …
U1a Modernization (U1a-M) is a multi-year set of activities and projects that would design and construct the necessary infrastructure and utilities…