Subcontractor shall furnish all labor, tools, equipment, materials, consumables, services, transportation, storage, and supervision necessary to re…
The Bonneville Power Administration proposes to allow the Umatilla Electric Cooperative to convert about 0.5 miles of 3 phase overhead conductor to…
Deliver detailed engineering package for Front End Engineering Design (FEED) Study and auxiliary details (process simulation, economic analyses, et…
The main objective of this project is to design, develop, additively manufacture, test, and validate three types (temperature, pressure, and blade …
Implement a collaborative Regional Initiative (RI) to accelerate the deployment of carbon capture, utilization, and storage (CCUS) in the Midwester…
Program management, materials, components and environmental behavior for model validation. …
Award Number: DE-EE0007166, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): IL, Office(s): Golden Field Office