Removal of two 1/2"-asbestos gaskets from an Inlet Sample Valve on the Purge Water Tank # 1 in M-Area (M-782002) and replace with asbestos gaskets.…
Preparation of reagents and non-radioactive quality control standards in support of Analytical Laboratories.…
A High Performance Liquid Chromatography (HPLC) system is used by Analytical Development for organic sample analysis. Sample aliquots injected into…
This R&D project will be examining separation of various uranium salts from environmental samples. The separation will employ solvent extraction us…
Repairs are needed for a damaged wall in room 1056 at 766-H.…
Temporary modification, 233H-TMC-18-256, is initiated to replace the currently installed water trap # 2 level probe (H-233000-STRP-LE-ZR.290L), loc…
The Uninterupted Power Supply (UPS) located in the Purification Area of the K-Area Complex, which services various components of the safeguards and…
The scope of this activity covers the initial assembly, test setup and operation of the helium (He) leak detection equipment and instrumentation fo…
BPA proposes to provide funding to the Yakima Klickitat Fisheries Program (YKFP) to implement improvements to a raceway at the Jack Creek Acclimati…
Bonneville Power Administration (BPA) proposes to allow T-Mobile to modify the existing wireless facilities located on transmission line structures…