Funding will support the project team's small-scale research and development activities to demonstrate and validate a virtual energy audit software…
Award Number: DE-EE0008627, CX(s) Applied: A9, B3.6, Water Power Technologies Office, Location(s): VA, Office(s): Golden Field Office
Project activities will support the Experimental Breeder Reactor II fuel movements from the Idaho Nuclear Technology and Engineering Center (INTEC)…
Carbon capture plant initial engineering analysis (pre-FEED) design will be completed.…
Remove existing roof layers of Building 6 (except roof decking) and replace with new roofing materials.…
BPA proposes to allow Washington County to pave an approximately 48-square-foot section of its Keeler-Oregon City No. 2 and Oregon City-Stub-C tran…
Award Number: DE-EE00008279, CX(s) Applied: A9, B1.15, B5.5, B5.21, State Energy Program, Location(s): AL, Office(s): Golden Field Office
Site construction will prep and paint the curbs and traffic stripping around the exterior of 735-4B.…
The Li'l Critter pump in building 723-A is used for pressure testing. Replacement of the Hydraulic Oil and process fluid in the Li'l critter pump i…
This EEC covers various general renovations for buildings 725-N, 725-1N, and 725-2N in Central Shops. This revision includes the installation of ad…