BPA proposes to replace nine single-glazed metal framed windows and add security film to three door windows in the Control House at Sno-King Subst…
BPA proposes to disconnect the conductor at structure 1/11 of their Filburt Tap to Forest Grove-McMinnville #1 115-kV transmission line.…
Construction personnel will remove asbestos insulation in the Hot Gang Valve Corridor and replace with non-asbestos insulation.…
The scope of this work is the extraction of deuterium oxide and singly-deuterated water from water and deuterium oxide mixtures using combinationso…
Award Number: DE-EE0008255, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): AR, Office(s): Golden Field Office
Development of lab, bench, and small test scale micropulldown reactor for the conversion of gas to carbon fiber crystals and the creation of carbon…
BPA proposes to fund Oregon Department of Fish and Wildlife (ODFW) to construct, fabricate, and install fish screens as per the National Oceanic an…
Install Universal Wiring, UW, in Building 703-47A.…
Construction personnel will seal asbestos insulation on the duct located in the closet of Room 125 - Building 704-H.…
Inspection and treatment of wood 13.8kva Feeder power poles in L-Area.…