Replace existing propane monitors at Building 754-11A.…
Four characterization soil bores northwest of the M Area Settling Basin to further characterize the high concentration VOC plume.…
This EEC addresses the installation of 12 groundwater monitoring wells and eight injection points ...…
Repair cracking, spalling, detaching of concrete along expansion joints and construction joints of the 221-H concrete exterior walls.…
Until a mission is identified for the facility, HB-Line will be maintained in a layup state.…
Oxidant injection to enhance remediation of chlorinated ethenes-tetrachloroethene, trichloroethene, and daughter products...…
Conduct a Front-End Engineering Design (FEED) study for the retrofit of the San Juan Generating Station (SJGS) with post-combustion carbon capture.…
717-8N and 717-9N Public Address System Installation…
Replace floor tile in building 713-1N, Section A1, Corridor No. 2 hallway between offices N321 and N204.…
Roofing rework at 105-13K.…