Decommissioning and demolition of buildings 389B and 390.…
The objective is to develop a continuous motion Direct Air Capture (DAC) system that will capture CO2 from the air and produce a >95 percent purity…
The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) proposes to perform administrative, planning, non-experimental research...
709-1G, Replace damaged tile and wallboard in ladies shower.…
The proposed action would include general PNNL business activities, award of contracts, a variety of information gathering techniques including lit…
Remove and repoint deteriorated mortar joints as necessary. Cut-out and caulk cracks in masonry with a high strength/low modulus epoxy. Patch exist…
The Geomechanics and Flow Lab will combine three previously permitted NETL labs: GGSCFL, Degradation of Wellbore Cements Due to CO2 Injection, and …
BPA proposes to fund the Colville Confederated Tribe (CCT) to construct instream structures [Beaver Dam Analogs and Post Assisted Log Structures] a…
In the Application, as relevant here, DECP asks DOE/FE to extend its 20-year export term in Order No. 3331-A to a term ending on December 31, 2050.
In the Application, as relevant here, Calcasieu Pass asks DOE/FE to extend its 20-year export term in Order No. 4346 to a term ending on December 2050