Radiological materials may be transferred to and from PNNL facilities to support a wide range of research projects.…
The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) proposes to install, relocate, maintain, test, qualify, and calibrate equipm…
The scope of the C-Area Ground Level Parking Project involves the alteration of two temporarygravel parking lots into a permanent asphalt parking lot…
The scope of the A7 Office Building project includes the design and construction of a multi-storyoffice building located within the parking lot in a …
The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) proposes to transfer radiological materials and/or waste, in accordance with…
Award Number: DE-EE0009080, CX(s) Applied: A9, A11, Building Technologies Office, Location(s): CO, Office(s): Golden Field Office
Award Number: DE-EE0009073, CX(s) Applied: A9, B3.6, B5.1, Building Technologies Office, Location(s): WI, Office(s): Golden Field Office
BPA proposes to fund the Confederated Tribes of the Umatilla Indian Reservation operation and maintenance activities on the Rainwater Wildlife Are…
To advance the technical readiness level of advanced molten salt reactors (MSR), the Nuclear Reactor Innovation Center (NRIC)is pursuingthe infrast…
Computational and laboratory R and D related to Core ShellMetal Organic Frameworks for Direct Air Capture.…