Repair and replace pipe hangers and replace rusty firewater piping in the 772-F laboratory on the service floor.…
Backup of sewage in building 706-6F occurred on March 26, 2020.…
INL is planning to design, build and install a high-pressure high-temperature furnace (hot isostatic press [HIP]) at the Materials and Fuels Comple…
Refurbishment of Building 706-2F includes numerous construction activitites.…
Refurbishment of Building 706-1F includes numerous construction activitites.…
Modeling for dry cooling and lab work with pervious concrete for cold energy storage that will be done at Lehigh University.…
Computational and experimental studies on converting coal-derived syngas into liquid methanol using an electrochemically pumped membrane reactor.…
National Association of Regulatory Utility Commissioners to support ongoing education of members on natural gas-related topics.…
Operations or STR will access and repair the line and decontaminate sewage as necessary.…
PNNL would install or relocate laboratory equipment, electronic hardware, maintenance equipment, health and safety equipment, safeguards and securi…