Scientific and technical advice and support to hydrate research in permafrost and marine settings. …
The purpose of this revision is to update the scope for the proposed Carbon Free Power Project (CFPP).…
The proposed action is to install a water line (approximately 15 to 20 feet in length) to support filling of a cooling tower chemical injection ba…
The scope of this project will be to develop and activate two new glovebox confinement enclosures in the South Workroom of the Fuel Manufacturing …
Idaho National Laboratory (INL) has a variety of highways and roads ranging from heavily used, paved State Highways to lightly used, unpaved two-tr…
Construction of an approximately 65,000 square foot facility consisting of wet chemistry and various mechanical laboratories and including a highba…
Subcontractors will repair the roof on Building (Trailer) 221-24H…
The acetylene service is being air gapped and capped out in 773-2A in order to comply with new calculations for flammability and explosives ...…
Prepare and measure rheology of H canyon samples.…
This activity scope includes the installation, operation and maintenance of a Thermotron DSX-6650 vibration system.…