Dominion Energy is installing fiber optic cables on top of 115 kV structures from 151-1K (Station 14) to 151-2C (Station 15-2).…
Dominion Energy to install new guy anchors due to transmission pole work near 751-B (Station 72).…
Install approximately 350 feet of duplex fiber optic cable (OS2-Singlemode (9/125)-Duplex-Fiber Optic Cable-FC to FC) from the EOCProjector Room (E…
This activity is for the potentiometric measurement of uranium (U) content for a wide variety of samples.…
Award Number: DE-EE0009083, CX(s) Applied: A9, B5.1, Building Technologies Office, Location(s): WI, Office(s): Golden Field Office
Award Number: DE-EE0009108, CX(s) Applied: A9, B3.6, B3.15, Advanced Manufacturing Office, Location(s): CA, Office(s): Golden Field Office
Demonstrate viscosifiers in binary complexes to achieve reversibly super-adjustable viscosities and implement in reservoir injection fluids.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Kiowa Creek-H…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Beaver Creek-…
Award Number: DE-EE0009098, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): CA, Office(s): Golden Field Office