WAPA, Rocky Mountain Region, proposes to complete the installation of buried all-dielectric self-supporting, ADSS, fiber optic cable from WAPA’s Ca…
U.S. Department of Energy, DOE, Office of Legacy Management, LM, is proposing to conduct coring and well installation using a Geoprobe followed by …
The proposed action would involve repairing ROW access roads to and from each structure and reclaiming the existing ROW staging areas (work-pads) …
Award Number: DE-EE0008728, CX(s) Applied: A9, B3.3, B3.6, Wind Energy Technologies Office, Location(s): ME, Office(s): Golden Field Office
CX-101869: REALIZE: Bringing zero energy home retrofits to market with a clean industrial revolution
Award Number: DE-EE0008185, CX(s) Applied: A9, B3.6, Building Technologies Office, Location(s): CA, Office(s): Golden Field Office
Award Number: DE-EE0009062, CX(s) Applied: A9, B3.6, Building Technologies Office, Location(s): MA, Office(s): Golden Field Office
Award Number: DE-EE0008508, CX(s) Applied: A9, B3.6, B5.15, Bioenergy Technologies Office, Location(s): IL, Office(s): Golden Field Office
The design proposes that a gutter will be installed under each joint at the upper level.…
The scope of work entails the removal of six existing trailers that occupy the surrounding area planned for the Large Scale Collaboration Center (L…
BPA proposes to correct impairments between structures 34/6 and 34/7 and 35/2 and 35/3 of the 115-kilovolt Chehalis-Raymond No. 1 transmission lin…