Vendor to pump out secondary containment at various locations, 619-N, 619-2N, and 619-4N.…
Subcontractor will provide roof repairs at 782-20G, 704-22G, 704-25G, and 782-3G.…
Research and Development Engineering, RDE, maintains a Radioactive Materials Area, RMA, in RDE Facilities where multiple sources are stored.…
During Phase I catalysts will be developed for conversion of CO2 to graphite.…
DOE-OE has requested that Idaho National Laboratory, INL, investigate new high temperature tolerant composite materials that could be used to enhan…
WAPA, Rocky Mountain Region, proposes to conduct routine vegetation management along its Terry Street-Erie, TRR-EE, 115-kV Transmission Line. …
This Amended Determination follows the approval of additional funds to support the project team's small-scale, research and development activities …
The Process Technology Programs, PTP, will conduct laboratory scale simulations of the Defense Waste Processing Facility, DWPF, process at the Aike…
Install two new pieces of equipment, a Flying Probe Tester and an air compressor in Building 730-A.…
Remove and replace 922 Condensate Tank Pump A in -20 of 105-L.…