Award Number: DE-EE0009107, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): CA, Office(s): Golden Field Office
The project objective is to produce a proof of concept for enhanced mechanical performance and durability of portland cement-based reinforced compo…
Prep and paint walls in Conference Room B, Room H-20, in Building 704-1N. …
Subcontractor will provide roof repairs at-K-Area Assembly Roof and Fan Room.…
Replace and reconfigure cubicles in building 248-H per Design Change Package, E-DCP-H-19008, to allow for additional personnel in the building.…
A subcontractor will remove sludge and or waste water from various sanitary waste water systems at SRS.…
Replace Uninterruptible Power Supply, UPS, number 1 in Building 707-C, Room 117.…
This EEC covers the catalytic testing and disposal of a proprietary iron oxide catalyst that will be obtained from Haldor Topsoe through a nondiscl…
Laboratory-scale testing of a membrane reactor containing bi-functional catalysts for the reaction of hydrogen and CO2 to form dimethyl carbonate(D…
Study energy storage technologies in the context of their impact on the operation and economics of a representative coal-fired power plant.…