DOE-OE has requested that Idaho National Laboratory, INL, investigate new high temperature tolerant composite materials that could be used to enhan…
WAPA, Rocky Mountain Region, proposes to conduct routine vegetation management along its Terry Street-Erie, TRR-EE, 115-kV Transmission Line. …
This Amended Determination follows the approval of additional funds to support the project team's small-scale, research and development activities …
The Process Technology Programs, PTP, will conduct laboratory scale simulations of the Defense Waste Processing Facility, DWPF, process at the Aike…
Install two new pieces of equipment, a Flying Probe Tester and an air compressor in Building 730-A.…
Remove and replace 922 Condensate Tank Pump A in -20 of 105-L.…
NDE Inspection of the DBCF underground piping.…
The existing 217-H Air Handling Unit, HQ-234000-HVAC-AHU-53.007, will be replaced.…
Replace and remove lighting fixture for outside roof lights on 292-2F with LED upgrade.…
Replace the 720-2A Automatic Transfer Switch, A721-600-ATS-01, due to suspected lightning strike.…