Replace and reconfigure cubicles in building 248-H per Design Change Package, E-DCP-H-19008, to allow for additional personnel in the building.…
A subcontractor will remove sludge and or waste water from various sanitary waste water systems at SRS.…
Replace Uninterruptible Power Supply, UPS, number 1 in Building 707-C, Room 117.…
This EEC covers the catalytic testing and disposal of a proprietary iron oxide catalyst that will be obtained from Haldor Topsoe through a nondiscl…
Laboratory-scale testing of a membrane reactor containing bi-functional catalysts for the reaction of hydrogen and CO2 to form dimethyl carbonate(D…
Study energy storage technologies in the context of their impact on the operation and economics of a representative coal-fired power plant.…
Develop novel ceramic-based thermocouples working at high temperature (750−1800 C) and high pressure (1000 PSI and above) coal-fired process for ac…
Design, construct, and test a novel, high-performance CO electrolysis reactor that produces two concentrated product streams: ethylene gas stream a…
Drill Stratigraphic Test Well, associated water well, and 120k ton CO2 injection to test formation activity.…
BPA proposes to allow an applicant with private property directly adjacent to the BPA fee-owned right-of-way to construct a fence to expand their …