Re-coating and re-lining of 2-inch and 4-inch sewer lines beneath Building 235-H.…
Subcontractor will provide roof repairs at 248-H.…
Site construction will prep and paint the exterior of the 735-B Stack and the associated fiberglass exhaust duct.…
Construction personnel will repair floors, walls, and ceilings on the 4th Level of H Canyon as specified in the referenced work orders.…
SRNL will perform experiments aimed at developing single crystals of novel and known actinide complexes.…
SRNL will dissolve stainless steel clad nuclear fuel using electrolytic dissolution.…
Abandoned fuel oil heater at 725-2N will be removed and disposed of at the scrap and salvage yard.…
Two (2) abandoned fuel oil heaters at 725-1N will be removed and disposed of at the scrap and salvage yard.…
Inspection and treatment of utility/power poles in the H-Area (Canyon, HTF, General, ETF) and S/Z/J-Areas.…
Main Feeder Utility Pole Treatment requiring soil disturbances within the A and SRNL Technical Area…