Construction of Pre-manufactured Modular Offices and Restroom Building Near CCO Storage Pad, K-Area. This space is needed for personnel supporting …
BPA proposes to install a single span of conductor on structure 5/6 of BPA’s Biglow Canyon-John Day No 1 transmission line.…
CX(s) Applied: A9, A11, Advanced Manufacturing Office, Location(s): Multiple, Office(s): Golden Field Office
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 1 through 18 on the Snake Creek-Box …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 29/2 through 30/1 on the Archer-Steg…
This study will enable the investigation of thermally driven phenomena that governs the microstructural evolution of nuclear materials by tailoring…
Covered activities include ongoing and future research work related to nuclear energy and physics research, non-nuclear energy research, basic and …
Activities: plug back existing wells, install sensors, cement well casing, test sensors, site restoration.…
DOE LM proposes to construct six permanent aerial survey quality control monuments at the Tuba City, Arizona, Uranium Mill Tailings Radiation Contr…
CX(s) Applied: Multiple, State Energy Program, Location(s): CO, Office(s): Golden Field Office