Develop a new pre-combustion sulfur and contaminant removal and capture process by integration of a low temperature water-gas-shift wiith a high te…
Demonstration of Utility Managed Smart Charging for Multiple Benefit Streams…
AI-Engine for Optimizing Integrated Service in Mixed Fleet Transit Operations…
Development of a Heavy-Duty Electric Vehicle Integration and Implementation, HEVII, Tool…
VoICE-MR, Vocation Integrated Cost Estimation for Maintenance and Repair of Alternative Fuel Vehicles-AFV…
Bonneville Power Administration (BPA) proposes to fund Tacoma Power to replace two of their wood pole transmission line structures.…
The scope of work is to repair the ZPPR North Tunnel, restoring its strutural integrity to support continued operation…
The BETHE Program seeks to fund the development of timely, commercially viable, fusion energy.…
Award Number: DE-EE0009112, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): WA, Office(s): Golden Field Office
Install aerial survey monuments for aerial survey activities at the Green River, Utah, Uranium Mill Tailings Radiation Control Act Title I Disposal…