Remove the solenoid valve which controls the plant air system regulator.…
Each of the two Work Orders covers the replacement of a Safety Steam Relief Valve.…
Remove building 707-11F and dispose in C and D Landfill.…
Remediation activities have been completed at several sites within A- and M-Areas.…
The damaged portion(s) of the DW line needs to be located, repaired and/or replaced.…
Final deactivation and decommissioning (D and D) of multiple D-Area buildings including: 480-3D, 482-2D, 484-1D, 484-2D, 484-4D, 710-16D, 717-3D, a…
Chiller systems used to regulate the temperature of R and D instrumentation and devices require a coolant for proper operation.…
This EEC covers various general renovations for buildings 725-N. 725-1N, and 725-2N in Central Shops.…
Bonneville Power Administration (BPA) proposes to provide funding to the Coeur d'Alene Tribe (CDAT) for maintenance activities on areas managed for…
The proposed action involves performing preventive, predictive, and corrective maintenance (i.e., repair) on a routine basis to verify that INL fac…