Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to install an ice bridge over an existing building at its Horse Hea…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Boysen-Boysen Ca…
Award Number: DE-EE0008733, CX(s) Applied: A9, B3.6, Wind Energy Technologies Office, Location(s): OR, Office(s): Golden Field Office
The fire alarm system in TRA 679 is in need of an upgrade.…
Replace Fire Alarm System in Building 703-47A.…
Remove out-of-service steam line section near 717-A.…
The purpose of this activity is to modify/improve mechanical properties for a thermosetting polymer extrusion process.…
Testing will be performed in the 773-A E-wing Shielded Cells to assess the impact of increased fissile loading in glass on glass durability.…
Replace existing General Services (GS) hydrogen supply isolation valves with new Safety Significant (SS) valves.…
Electrical load consolidation from Motor Control Center (MCC) MCC-32M1 to MCC-38M1.…