Disconnect and remove Rigid saw from weld test area in 711-2N.…
This modification will transition all of the head-end components of the E3S Closed Circuit TV system to IVAS.…
Remove abandoned Load Line 1 Welder Controller and Powerstat.…
709-1G, Replace tile and wallboard in ladies shower. Install new shower insert.…
Fence the 299-H Building out of the Limited Area (LA) as required and meet the needs of the 299-H facility transportation requirements.…
DOE is replacing the current media disintegrator at 703-A with the Solid State Media Disintegrator.…
Renovate 211-8H Lunch Room with new flooring, ceiling tile, paint, and appliances.…
BPA proposes to provide funds to the Nez Perce Tribe (NPT) for harvest monitoring within the Snake, Salmon, and Clearwater Rivers and their tributa…
This Environmental Compliance Permit (ECP) addresses projects at the INL Center for Radiation Chemistry Research using the gamma irradiators and de…
NRIC is a national program led by Idaho National Laboratory (INL) that enables collaborators to harness the world-class capabilities of the U.S. Na…