Circuit cards that are in need of repair have a conformal coating making it difficult to take measurements to identify non functioning components.…
Excess several pieces of equipment/machinery that have been taken out of service in N-Area.…
Humate tanks and associated piping will be flushed with water to remove Potassium Humate (BorreGro HA-1) solids that have settled in the tanks and …
CX(s) Applied: A9, Advanced Manufacturing Office, Location(s): Multiple, Office(s): Golden Field Office
Award Number: DE-EE0009352, CX(s) Applied: A9, Solar Energy Technologies Office, Location(s): WI, Office(s): Golden Field Office
This Amended Determination follows ARPA-E's receipt of required information and certifications from Prime Recipient, C-Crete Technologies (Control …
MT-SRT-2018-00003 has been created to replace the existing fire alarm panel and DACT in Building 786-A with a new panel (Notifier NFS-320) due to i…
The 503-2A Diesel Generator (DG) was installed in 1984 and is functionally classified as General Services (GS) and used as a back-up generator.…
The Analytical Development group uses Leeman Prodigy Inductively Coupled Plasma Emission Spectrometers (ICPES) to perform elemental analysis on bot…
Repair damaged/rotten wood panel in the lead change out area of 711-4N.…