Energize Missouri HUG Teter CX(s) Applied: B5.19 Date: 05/15/2012 Location(s): Missouri Offices(s): Golden Field Office
Office of NEPA Policy and Compliance
May 15, 2012Energize Missouri HUG Teter
CX(s) Applied: B5.19
Date: 05/15/2012
Location(s): Missouri
Offices(s): Golden Field Office
The project is a 6-ton vertical closed-loop ground source heat pump system to service the Teter's 4,000 square foot single family residence.
CX(s) Applied: B5.19
Date: 05/15/2012
Location(s): Missouri
Offices(s): Golden Field Office
The project is a 6-ton vertical closed-loop ground source heat pump system to service the Teter's 4,000 square foot single family residence.