Facility Heating, Ventilation, and Air Conditioning System Conversion to Ground Source Heat Pump (Phase 1 Modification)CX(s) Applied: B3.7Date: 05/12/2010Location(s): MontanaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Office of NEPA Policy and Compliance
May 12, 2010CX(s) Applied: B3.7
Date: 05/12/2010
Location(s): Montana
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office
Flathead Electrical Cooperative (FEC) was issued their original National Environmental Policy Act (NEPA) determination for the feasibility and engineering associated with the installation of 4, 20 ton geothermal open-looped heat pumps. They were not allowed to drill a test well under their original Phase 1 NEPA determination. This categorical exclusion covers the drilling of two test wells into the already breached evergreen aquifer to inform the engineering and permitting process.