
The EM Nevada Program recently reached a major milestone when its environmental program services contractor reached 3.5 million hours without a lost workday due to a safety incident.

Work is underway at EM’s Portsmouth Site on the first of five legacy groundwater plumes to be excavated for soil needed in the newly constructed On-Site Waste Disposal Facility (OSWDF).

The Savannah River Site (SRS) has made significant progress in cleaning up contaminated groundwater from legacy nuclear operations near two chemical separations facilities.

With hopes for rain during monsoon season amid exceptional drought conditions, the EM Los Alamos Field Office and cleanup contractor Newport News Nuclear BWXT-Los Alamos recently activated samplers at 183 monitoring sites that collect surface water.

The U.S. Geological Survey (USGS) recently drilled a new well at the north end of the Idaho National Laboratory (INL) Site.

Almost a year after shutting off three vapor treatment units at a former radioactive and hazardous waste landfill at the Idaho National Laboratory Site, analytical data from thousands of vapor samples indicate that cleanup objectives have been achieved.

For the first time, workers at EM’s Paducah Site are able to closely examine the primary source of off-site groundwater contamination directly underneath the C-400 Cleaning Building.
EM and its cleanup contractor at the West Valley Demonstration Project (WVDP) will resume using a rail line to ship waste offsite starting this month.

While it’s often the Hanford Site’s six advanced pump-and-treat facilities that get the glory — they’re on track to treat more than 2 billion gallons of contaminated groundwater for the seventh straight year.

The EM Nevada Program recently hosted its first-ever virtual field trip, highlighting for nearly 200 students its safe, secure, and successful groundwater mission at the Nevada National Security Site (NNSS).