The DOE Office of Energy Dominance Financing (EDF) is considering whether to issue a loan guarantee of a funding facility to Hawaiian Electric Company (HECO).
The proposed project is a 5MW/20MWh battery energy storage system (BESS), the construction of which includes minor grading, shallow foundations, an…
Subrecipient proposes to purchase and interconnect a commercially available 9.1 MW, 36.4 MW-hr. battery energy storage system (BESS) within its ser…
FEC plans to installation of a 1,000 kW/4,000 kWh containerized lithium-ion battery energy storage system (BESS) within the existing developed oper…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform construction, operation, upgrade, or decommissioning of an electroche…
Install a 76.8 kWh Battery Energy Storage System (BESS) to operate in conjunction with the pre-existing solar photovoltaic (PV) array at Kids are U…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Rincon San Luiseño Band of Mission Indians (Rincon) to deploy three (3) energy microgrid systems at buildings owned and operated by Rincon and located on the Rincon Indian Reservation, in Valley Center, CA.
Clinica Family Health and Wellness will install battery energy storage system (BESS) at its Thornton Medical and Dental Clinic. The battery is a 35…
Clinica Family Health and Wellness will install battery energy storage system (BESS) at its Lafayette Medical and Dental Clinic. The battery is a 1…
Clinica Family Health and Wellness will install battery energy storage system (BESS) at its Pecos Medical and Dental Clinic. The battery is a 60 kW…