Installation of one (1) Battery Energy Storage System (BESS) and electrical connection of essential businesses and residences in close geographic p…
Installation of battery energy storage systems of various sizes at sites in Minneapolis, MN.…
Improving the thermal envelope, replacing the HVAC system, upgrading the “black start” diesel generator systems of the generating plant, and instal…
Project work involves the development of microgrids on two major data center sites in Virginia (Iron Mountain) and South Carolina (Grace Complex). …
(1) hardening or undergrounding of over 950 distribution poles, (2) hardening 57 transmission spans, (3) installing Fault location, isolation and r…
Claverack's BESS-integrated microgrid will directly benefit at least three feeders serving the Steinbach substation. The battery system will use a …
The United States Department of Energy (DOE), Office of Energy Dominance Financing (EDF) is considering whether to issue a loan guarantee of a funding facility to Interstate Power and Light Company (IPL or the Applicant) pursuant to its authority under the EDF Program.
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the San Carlos Apache Tribe (SCA) to design, develop, and install an integrated microgrid energy system, which would include a 500 kilowatt (kW) battery energy storage system (BESS), a 750 kW solar photovoltaic (PV) array, and a microgrid controller.
The U.S. Department of Energy (DOE) is proposing to provide Congressionally Directed Spending to the Grand Traverse Regional Land Conservancy (GTRLC) for the installation of a 1.15 megawatt battery energy storage system (BESS) at the GTRLC Headquarters in Traverse City, Michigan.
Installation of battery energy storage systems of various sizes at five sites: Site 1 - Ooltewah, TN, Site 2 - Signal Mountain, TN, Site 3 - River …