Bonneville Power Administration (BPA) proposes to move and raise four transmission structures in Federal Way, Washington to accommodate Sound Trans…
BPA is proposing to allow Pacificorp to mount four antennas on BPA's radio tower at the Sunnyside Radio Station, add coax/waveguide to the tower an…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
This project will scale a single-stage (Type I) Solid State Transformer (SST), that has been demonstrated in single module operation, to a cascaded…
GVEA plans to take a comprehensive approach to prioritizing and hardening transmission poles in the interior of Alaska. With the use of drones, AI …
Bonneville Power Administration (BPA) proposes to replace and update electrical equipment at the existing Monroe Substation located about 3.2 miles…
Activities will include the proactive replacement of at-risk, aging, critical electrical infrastructure. Specific activities will include substatio…
Installation of new transmission poles and overhead line equipment in existing right-of-way and removing of existing poles and accessories. Replace…
The installation of status and wireless control of distribution system equipment including the installation of advanced metering infrastructure for…
CX-034839: LCRA Sim Gideon (Power Generation Facility) Comprehensive Control and Monitoring Upgrades
Sub-recipient will Upgrade AVR with Power System Stabilizer, remove and replace disturbance monitoring equipment, install real-time vibration monit…