The DOE Loan Programs Office is considering whether to issue a loan guarantee of a funding facility to the Alabama Power Company pursuant to its authority under the Energy Infrastructure Reinvestment 1706 Program.
Construction related activities for equipment replacement and/or upgrades. This may include pole replacement, traversing unpaved roads, storage of …
This is a targeted, reliability and resiliency improvement driven project at the Leesburg Electric North Substation for the replacement of an out o…
BUECI plans to upgrade existing aged switchgear with modern, better weatherized vacuum circuit breakers and protective relays. The new system will …
Install a Battery Energy Storage System (BESS) and smart distribution reclosers on the PGE Oxford-Rural distribution system.…
Install new and improved fault detection devices on existing facilities designed to mitigate sources of wildfire ignition. Replace existing wood po…
BPA proposes to reconductor and replace associated hardware along the Wautoma-Rock Creek No. 1 500 kV transmission line from miles 37 to 43. Replac…
BPA proposes to allow various telecommunications companies to upgrade their wireless network antennas and equipment at existing sites on BPA transm…
Bonneville Power Administration (BPA) proposes to install work safety fall protection equipment on its lattice-steel and tubular-steel electrical t…
Bonneville Power Administration (BPA) proposes to apply fire retardants to select wood poles throughout the BPA service territory. The proposed wor…