The proposed action involves the construction of an engineered eco-block retaining wall system, backfilling of the void space with clean fill dirt …
Office of NEPA Policy and Compliance
September 15, 2026The proposed action involves the construction of an engineered eco-block retaining wall system, backfilling of the void space with clean fill dirt and rock to create a level working surface, and the installation of a safety railing. The action would be entirely within the boundaries of the Alvey Maintenance Headquarters site on previously disturbed land and would support transmission infrastructure projects.