The Bonneville Power Administration (BPA) proposes to replace conductor insulators on the Big Eddy-Spring Creek No. 1 230 kV transmission line. BPA…
Office of NEPA Policy and Compliance
September 4, 2026The Bonneville Power Administration (BPA) proposes to replace conductor insulators on the Big Eddy-Spring Creek No. 1 230 kV transmission line. BPA owns and operates this transmission line, located on private, Federal, and state lands within Wasco County, Oregon and Klickitat County, Washington.