CX-036447: Big Eddy – Spring Creek Insulator Replacement

The Bonneville Power Administration (BPA) proposes to replace conductor insulators on the Big Eddy-Spring Creek No. 1 230 kV transmission line. BPA…

Office of NEPA Policy and Compliance

September 4, 2026
Estimated Read Time   min

The Bonneville Power Administration (BPA) proposes to replace conductor insulators on the Big Eddy-Spring Creek No. 1 230 kV transmission line. BPA owns and operates this transmission line, located on private, Federal, and state lands within Wasco County, Oregon and Klickitat County, Washington.