In support of decontamination and decommissioning (D and D) at the Portsmouth Gaseous Diffusion Plant (PORTS) and the current U.S. Department of Energy (DOE) mission of preparing areas for industrial reuse at PORTS, DOE plans to deactivate, demolish, and disposition two trailer complexes: the X-151 Contractor Office Trailer Complex and the X-152 Site Operations Management Complex.
The U.S. Department of Energy (DOE) Portsmouth/Paducah Project Office (PPPO) proposes actions that include on-site waste handling and generation, waste reduction, pollution prevention, property transfer of surplus personal property, and asbestos abatement projects at the Paducah Gaseous Diffusion Plant (PGDP).
The U.S. Department of Energy (DOE) plans to deactivate, demolish, and disposition ancillary small structures, piping or equipment, and tanks at the Paducah Site that supported the former uranium enrichment facilities and are aging and/or deteriorated, and no longer needed.
Ethylene Glycol/Water with Selenium (~15 Gallons) will be drained to the Sanitary Sewer for treatment at Central Sanitary Wastewater Treatment Faci…
Ethylene Glycol with Selenium (~20 Gallons) will be drained to the Sanitary Sewer for treatment at Central Sanitary Wastewater Treatment Facility.…
LM is proposing to conduct routine long-term surveillance and maintenance (LTS and M) actions at the Boiling Nuclear Superheater (BONUS), Puerto Ri…
The proposed work activity is to transfer wastewater from the F-Canyon B-Basins to the Effluent Treatment Facility (ETF) using an approved Waste Co…
This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F). This process is required to prepar…
Fermi National Accelerator Laboratory (Fermilab) proposes to continue the periodic shipment of low-level radioactive waste, excluding high level wa…
Drain and Disposition 717-A Drill Press.…