ROD to demolish the 18 buildings that DOE owns in Area IV of SSFL and dispose of or recycle the materials off site.
Record of decision authorizing Gulf LNG to export domestically produced liquefied natural gas to non-FTA countries.
BPA decided to enter into an amended land use agreement with the Navy concerning Bonneville’s existing 69-kV Boardman-to-Ione transmission line.
A decision to allow interconnection of a wind farm in Mohave County, Arizona, to WAPA’s transmission line.
Assesses proposal to construct and operate an LNG marine terminal, pipeline, and associated facilities, in Jefferson and Orange Counties, TX, and LA.
Analyzes siting, construction, and operation of LNG export facilities and certain interstate, natural gas transmission pipeline facilities.
Proposal to rebuild and upgrade two 115-kV transmission lines between the Flatiron Substation and the intersection of Mall Rd and US Hwy 36 in CO.
Construction and operation of 1) a proposed LNG export terminal; and 2) a 23.8-mile, 42-inch-diameter pipeline in Cameron Parish, Louisiana
Addresses those portions of the direct-feed low activity waste functions and facilities that were not addressed by the 2013 TC&WM EIS ROD
Walla Walla Basin Spring Chinook Hatchery Program; Umatilla County, Oregon