Ault-Craig 345-Kilovolt Transmission Line Eastern Colorado Maintenance Office Danger Tree Management CX(s) Applied: B1.3 Date: 09/09/2013 Location(s): Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain R...
Optimization Project #3 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 07/26/2013 Location(s): Wyoming Offices(s): RMOTC
Optimization Project Area #1 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 07/26/2013 Location(s): Wyoming Offices(s): RMOTC
Cheyenne Substation KV2A 115-kilovolt Tie Line Installation CX(s) Applied: B4.6 Date: 07/02/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Optimization Project Area #2 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 06/28/2013 Location(s): Wyoming Offices(s): RMOTC
Big George Substation Access Road Snow Prevention, Park County, Wyoming CX(s) Applied: B1.11 Date: 06/20/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Alcova-Miracle Mile East 115 Kilovolt Transmission Line Structure Replace and Road Maintenance, Carbon and Natrona Counties, Wyoming CX(s) Applied: B1.3 Date: 06/20/2013 Location(s): Wyoming, Wyoming Offices(s): Western Area Power Administration-Rocky...
Advancing Synchrophasor Applications and Training through Academic-Industry Collaborations CX(s) Applied: A9, B3.6 Date: 06/17/2013 Location(s): Wyoming Offices(s): National Energy Technology Laboratory
Chevron Methane Leak Test CX(s) Applied: B3.1, B3.2, B3.11 Date: 06/13/2013 Location(s): Wyoming Offices(s): RMOTC
Load Control System Reliability CX(s) Applied: A9 Date: 05/29/2013 Location(s): Wyoming Offices(s): National Energy Technology Laboratory