Buried Power Line to 64-SX-3 CX(s) Applied: B1.3, B4.6, B4.12 Date: 05/17/2012 Location(s): Wyoming Offices(s): RMOTC
Alcova-Casper North 115 Kilovolt Transmission Line Pole Replacements CX(s) Applied: B1.3 Date: 04/10/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Torrington-Wildcat 69 Kilovolt Transmission Line Rebuild Project CX(s) Applied: B4.13 Date: 04/02/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Cheyenne Substation West Control Building Roof Replacement CX(s) Applied: B1.3 Date: 04/02/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Terry Ranch Road Substation CX(s) Applied: B1.24, B4.11 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Erosion Control Measures Structure No. 110-3 Dave Johnston to Stegall 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Archer Communications Building Laramie County, Wyoming CX(s) Applied: B4.6, B4.11 Date: 03/07/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Archer Communications Building CX(s) Applied: B4.6 Date: 03/07/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Sustainable Energy Solutions LLC - Cryogenic Carbon Capture (Phase 2) CX(s) Applied: B3.6, B3.9 Date: 01/24/2012 Location(s): Utah, Wyoming Offices(s): Advanced Research Projects Agency-Energy
Routine and Proposed Actions at the Riverton, Wyoming, Processing Site CX(s) Applied: B1.3, B3.1 Date: 01/12/2012 Location(s): Wyoming Offices(s): Legacy Management