Archer-Cheyenne North/South 115-kilovolt Transmission Line Structure Replacement CX(s) Applied: B4.13 Date: 03/18/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Office of NEPA Policy and Compliance
March 18, 2014Archer-Cheyenne North/South 115-kilovolt Transmission Line Structure Replacement
CX(s) Applied: B4.13
Date: 03/18/2014
Location(s): Wyoming
Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration proposes to replace six existing wood-pole structures along the Archer-Cheyenne South (ARH-CH S) and Archer-Cheyenne North (ARH-CH N) 115-Kilovolt Transmission Lines.
CX(s) Applied: B4.13
Date: 03/18/2014
Location(s): Wyoming
Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration proposes to replace six existing wood-pole structures along the Archer-Cheyenne South (ARH-CH S) and Archer-Cheyenne North (ARH-CH N) 115-Kilovolt Transmission Lines.